Suyantra AI Copilot

One copilot. Seven places it does real work.

Suyantra is a single product built on one connected model of your design. Each capability below writes into that model, and every capability downstream can see what it depends on.

01 · Requirements Intelligence

Separate what you said from what it worked out.

A requirement document is rarely complete. Suyantra reads it as an engineer would — recording what was stated, deriving what follows, declaring what it had to assume, and opening a question wherever a value is simply missing.

A

Structured capture

Electrical, thermal, mechanical and environmental constraints are extracted into typed fields rather than left as prose.

B

Conflict detection

Requirements that cannot be satisfied together are flagged at capture time, not discovered during verification.

C

Open questions

Missing operating conditions become tracked questions with a named owner, not silent defaults.

D

Provenance on every value

Stated, inferred, assumed or verified — attached to the value itself, wherever it is later used.

REQ-002 · CAPTURE3 OPEN
Input, nominal24 VStated
Operating range18–36 VStated
Ambient−40 … +85 °CStated
Total output power37.25 WInferred
AirflowNatural convectionAssumed
Input transient profileNot statedOpen
02 · Architecture Reasoning

Candidate architectures, with the trade-off stated.

Suyantra does not hand you one answer and call it the recommendation. It proposes candidate topologies, states what each one trades away, and leaves the selection where it belongs — with the engineer.

Candidate A Two-stage conversion. Fewer high-voltage parts, one more conversion loss to account for.
Candidate B Parallel rails from the input. Better rail isolation, more wide-VIN parts to qualify.
Recorded as Graph nodes with dependencies, not a paragraph in a document.
Selection Deferred to the engineer, and recorded with the reason it was chosen.
03 · Component Intelligence

Evaluated at the operating point, not matched on keywords.

A parametric search tells you which parts contain a number. Suyantra evaluates whether a part survives your worst case — and shows the datasheet parameter that decided it.

Input

The operating point computed from the design, not the nominal figure.

Lookup

Datasheet parameters retrieved with the section they came from.

Rule

Ratings and derating policy applied deterministically.

Lifecycle

Availability and obsolescence treated as engineering constraints.

Verdict

Pass, fail, or blocked with the missing parameter named.

A part with an unavailable parameter is blocked, not approximated. If the datasheet does not publish what a check needs, Suyantra says so rather than substituting a typical value.
04 · Circuit Verification

The model explains. The rules decide.

Verification runs as deterministic checks against the design. The language model is used to interpret, retrieve and explain — never to produce the verdict itself.

Check classes DETERMINISTIC
Voltage rating vs worst caseRating checkDecidable
Current capability vs node currentRating checkDecidable
Power budget across the treeBudget checkDecidable
Thermal margin at stated ambientNeeds θJAConditional
Ripple and EMI pre-screenNeeds fswBlocked
Why blocked is a result, not a failure Blocked

A check that cannot run is more useful than a check that ran on an invented input. Blocked results carry the name of the missing value, who can supply it, and which downstream checks are waiting behind it.

Missing · fsw Blocks · 2 downstream checks
Verification supports engineering judgement and does not replace simulation, qualification or sign-off by a responsible engineer.
05 · BOM Intelligence

The bill of materials is an engineering artefact.

Lifecycle status, second-source coverage and sourcing exposure are design constraints, not procurement afterthoughts. Suyantra keeps each line traceable to the requirement that produced it.

01

Lifecycle exposure

Active, NRND and end-of-life lines separated, with the design decisions each one sits under.

Risk, surfaced early
02

Second-source coverage

Which lines have a qualified alternate, which do not, and what a substitution would invalidate.

Schedule risk
03

Traceability

Every line answers the question “why is this part here?” with a link, not a memory.

Audit-ready
06 · Design Review

Eight disciplines, one structured pass.

Power, digital, analog, EMC, reliability, manufacturing, components and a principal-engineer perspective — each reviewing for its own concerns, each finding carrying evidence, action and confidence.

Power Digital Analog EMC Reliability Manufacturing Components Principal Engineer

A worked example of the review output is shown on the homepage.

07 · Change Impact

Changes are objects, not conversations.

An engineering change carries an impact set, an invalidation list and a history. Suyantra computes what must be re-verified from recorded dependencies — and states plainly what is untouched.

Impact set Computed from the graph, not from keyword similarity.
Invalidation Verification results that no longer hold are cleared, not left stale.
Unaffected Stated explicitly, so a change does not trigger a full re-review.
History Retained against the design and readable later.

The interactive 24 V → 48 V example lives on the homepage.

Next

See how the pieces fit together.

Walk through the flow from requirement capture to change tracking, or tell us how your team works today.